Property education · 138 guides
Property education
Practical property education, investment strategies and development learning. Each guide explains its scope; check local requirements and current official sources for your site.
A Child Care Centre On Your Development Site: The NSW Space, Concurrence And Traffic Checks
A child care centre can pay more per square metre than housing, but the national space ratios, the NSW concurrence step and the traffic test often decide the site before the architecture does. Test them before you buy.
A Creek Runs Through It: The Queensland Water Permit Behind Your Subdivision
In Queensland, digging, filling or clearing inside a watercourse needs a riverine protection permit unless every exemption requirement is met, and that sits outside your development approval. Test the creek line before you fix the lot layout.
Acid Sulfate Soils NSW: The Excavation And Dewatering Site Test
On coastal NSW floodplains the soil under your site can turn from harmless clay into acid when you excavate or lower the watertable. Test the mapping, the depth and the disposal route before you commit to a price.
Appoint Your Principal Certifier Before Anyone Picks Up a Tool
The principal certifier cannot be appointed late, cannot be chosen by your builder, and has to inspect at stages that will already be covered up. Get the appointment and the inspection schedule right before work starts.
BASIX Changed Your Design: Why The Certificate Must Match The Approved Plans
In NSW the BASIX certificate is a pre-lodgement requirement that has to keep describing the building you actually construct. Here is the sequence that stops a late design change costing you a second round of approvals.
Before You Approach the Neighbours: Build a Development Site Assembly Map
Map ownership, physical constraints, control sequence and fallback positions before treating adjoining lots as one development opportunity.
Before You Buy the Site: Choose the Exit That Must Work
Use an exit-first decision map to test who will buy, rent or fund the finished product before the land controls your strategy.
Before You Contact Owners: Rank Development Sites by Outreach Priority
Turn a long property list into an evidence-led outreach queue based on strategic fit, contact readiness, value potential and fallback options.
Before You Count the Sales: Map Settlement Cash Flow in Your Feasibility
Model when sale proceeds can actually become available and test the debt, tax, delay and completion obligations that sit between sale and cash.
Before You Demolish: The Asbestos Check That Runs Before Your First Development Decision
Learn when an asbestos check belongs in Australian property development due diligence, how licensed removal thresholds work and why an older house changes a demolition budget.
Before You Form a Property Joint Venture: Decide Who Can Say Yes
Use a decision-rights matrix to clarify authority, spending limits, deadlocks and exits before money or relationships are under pressure.
Before You Make an Offer: Calculate the Land Price the Deal Can Carry
Work backwards from conservative project outcomes to set an evidence-based land offer ceiling before negotiation pressure takes over.
Before You Pay for Every Report: Build a Staged Due-Diligence Budget
Learn how to stage property-development due diligence, set a sensible investigation budget and decide when a site has earned deeper specialist work.
Build To Rent Australia Explained: A Growing Model Investors Should Understand
What build to rent is, how it works in Australia, and why investors are watching this emerging property model closely.
Builders Warranty Insurance Australia: What Cover Investors Should Confirm Before Building
What builders warranty insurance actually covers in Australia and the checks investors should make before a build starts.
Buying A Rented House To Redevelop: The NSW Notice You Have To Get Right
In NSW a landlord can only end a tenancy on a prescribed ground, and the demolition and renovation grounds carry fixed notice periods, supporting documents and a re-letting exclusion period.
Buying Reserved Land in WA: Do Not Price an Assumed Government Buyout
A region-scheme reservation can affect a purchase strategy without guaranteeing when the WAPC will buy, or that a new buyer inherits a compensation entitlement.
Can a cheaper townhouse cost more to live in?
Use an Accidental Millionaire case and fictional weekly budgets to compare townhouse sites, renter travel and evidence for achievable rent.
Co-Living Property Investment Australia: How The Model Works For Investors
An explainer on co-living property investment in Australia, covering how the model works and the risks involved.
Comparable Sales Property Development Australia: How To Use Comps Before Trusting The Numbers
Learn how comparable sales affect property development feasibility in Australia and how investors can use sales evidence before making offers.
Construction Contract Red Flags Australia: What Investors Should Read Before Signing
Key construction contract red flags Australian property investors should look for before signing a building agreement.
Contaminated Land Before You Buy: The NSW Due Diligence Sequence
In New South Wales a consent authority cannot approve a development unless it has considered whether the land is contaminated. That obligation is met by evidence you commission, so the investigation has to run before the application is lodged — not after.
Contract Assignment Clause Australia: How Nominee And Assignment Rights Work
A plain-English guide to nominee and assignment clauses in Australian property contracts and how investors use them.
Contract Extension Clauses Australia: How Investors Buy More Time On A Deal
How contract extension and settlement extension clauses work in Australian property deals, and when investors should use them.
Contract Of Sale Special Conditions Australia: Clauses Investors Should Understand
A plain-English guide to special conditions in Australian property contracts and why investors should read them line by line.
Cooling Off Period Property Australia: What Investors Need To Know Before Signing
How cooling off periods work across Australian states and why property investors often waive them in fast-moving deals.
Council Approval Timeline Australia: Why Investors Underestimate How Long Approvals Take
Why Australian property investors consistently underestimate council approval timelines, and how to plan projects more realistically.
Council Zoning And Overlays Australia: How They Affect Property Development Deals
Learn how council zoning and overlays affect property development deals in Australia and why investors should check planning controls before making an offer.
Cross Collateralisation Risk Australia: Why Linking Loans Can Limit Your Options
Why cross collateralisation between properties can restrict Australian investors and how to avoid getting locked in by your bank.
DA vs Complying Development in NSW: Choose the Right Approval Path Before You Buy
Compare development applications and complying development in NSW, including eligibility, timing and the checks investors should complete before buying.
Defects Liability Period Australia: What Investors Should Know Before Handover
What the defects liability period covers on an Australian build and how investors should manage it before and after handover.
Deferred Commencement In NSW: The Consent That Has Not Started Yet
A deferred commencement consent is granted but does not operate until you satisfy council on specified matters. If you assume approval day starts the clock, you can buy or hold a consent that never switched on.
Demolition Permits Australia: What Investors Need Before Knocking Down A Property
A practical guide to demolition permits in Australia and what property investors must arrange before knocking down a building.
Detention Or Dead Space? What Stormwater Really Costs A Small Site
On-site detention is a cost you can budget and a land take you cannot. Before you make an offer, find out how many square metres of your site the water needs.
Development Margin Australia: How To Know If A Deal Is Worth The Risk
Learn how to judge development margin in Australia with conservative values, full cost allowances and simple risk checks before you commit to a deal.
Dewatering NSW: The Groundwater Approval That Stops Excavation
In New South Wales, digging below the watertable or draining a basement can be an aquifer interference activity. Development consent does not give you permission to take the groundwater, so test the licence and approval path before you price the dig.
Dual Key Property Investment Australia: How The Model Works And What To Check
What dual key properties are, how the rental split works, and the key checks Australian investors need before buying one.
Dual Occupancy Vs Duplex Australia: Understanding The Difference Before You Buy A Site
Dual occupancy and duplex are not the same thing — here's what Australian investors need to know before buying a development site.
Duplex Development Australia: The Site Checks Investors Should Understand First
Learn the first checks for duplex development in Australia, including zoning, frontage, slope, services, parking, setbacks, costs and buyer demand.
Easements And Covenants Australia: The Hidden Title Restrictions That Can Kill A Deal
How easements and covenants on an Australian property title can restrict development, and what investors should check before buying.
Exit Via Wholesale Assignment Australia: How Investors Sell A Deal Before Settlement
How wholesale assignment works in Australian property investing, allowing investors to sell a contract before settlement.
Flood Zone Property Risk Australia: What Investors Should Check Before Buying A Site
How to check flood risk on an Australian property before buying, and what it means for insurance, finance, and resale value.
Four townhouses and the last set of keys
You plan to sell three townhouses and keep the fourth. A delayed settlement can change the amount of cash available when the project loan comes due.
Granny Flat Development Australia: What Investors Should Check Before Adding A Second Dwelling
What Australian investors need to check before building a granny flat, from council rules to rental returns and finance traps.
Heritage Overlay Property Development Australia: What It Means For Your Site
What a heritage overlay means for developing a property in Australia and how it affects design, approvals, and cost.
How to Build an Opportunity Map Before You Search for Development Sites
Convert your strategy and constraints into a repeatable map of locations, property clues and disqualifiers before inspecting listings.
How to Source Development Sites by Solving the Right Constraint
Turn visible site constraints into disciplined sourcing questions without mistaking difficulty for hidden value.
In Canberra, the Extra Dwelling Carries Its Own Tax Bill
In the ACT you vary the Crown lease to add dwellings, and that variation attracts a lease variation charge. Price it per dwelling before you assume the uplift.
In Perth, a Panel Decides Some Applications Instead of the Council
Western Australia sends many larger developments to a Development Assessment Panel rather than the local council. Know the thresholds, the election and the excluded classes before you lodge.
In Victoria, Open Space Is Priced Into Your Subdivision
Victoria lets a council require up to 5 per cent of the land, or up to 5 per cent of site value, for public open space. Price it before you fix your lot layout.
Infrastructure Uplift Property Value Australia: How New Projects Can Move Prices
How new roads, rail and infrastructure projects can lift Australian property values, and how investors can assess the impact.
Joint Venture Property Deals Australia: How To Structure Property Opportunities Without Doing It All Yourself
Learn how joint venture property deals work in Australia. This guide explains roles, capital partners, deal finders, feasibility, legal agreements, risk, profit sharing and how investors can structure property opportunities safely.
Keep the front house or clear the site for two new homes?
Use a real Accidental Millionaire case and a worked example to compare retained-home and clear-site designs, construction access, costs and end values.
Land Banking Australia: When It Works And When It Just Burns Cash
Learn how land banking works in Australia, the risks investors often underestimate, and when it may make sense versus when it just ties up cash.
Landowner Consent In NSW: The Signature That Makes Your DA Valid
In NSW an owner's consent to a development application must be in writing, and without it a consent authority has no power to determine the application. On a deal where you do not yet own the land, that signature is a commercial risk to be managed early.
Mezzanine Finance Property Development Australia: Filling The Gap Between Debt And Equity
How mezzanine finance works in Australian property development and when it's used to bridge the gap between senior debt and equity.
Mine Subsidence Districts NSW: The Second Approval Before You Subdivide
If the land sits inside a declared mine subsidence district, Subsidence Advisory NSW must approve the building or subdivision before work starts. Test the guideline, the design and the separate subdivision application.
Multiple BASIX Certificates In NSW: When One Certificate Covers The Whole Development
For new dwellings the applicant lodges one BASIX certificate covering all of them. Separate certificates for different parts of a project need consent authority approval, and the timing rule bites at three separate stages.
Nobody Budgets For The Pits: Phone And Internet Costs In A New Development
Every new lot needs fibre-ready facilities and a carrier arranged before completion, and the developer contributions come off your bottom line. Here is the pit-and-pipe test to run before you fix your feasibility.
NSW Design Practitioner Declarations: Price the Compliance Gate Early
Some NSW residential apartment work needs registered practitioner involvement and declarations, which can affect consultant scope, timing and budget.
NSW Dilapidation Surveys: Record Next Door Before Excavation Starts
Before NSW excavation, define neighbouring-property survey coverage, record inspection limits and budget the condition baseline without confusing it with design.
NSW Title Restrictions: Check the New Section 88B Release Route Before Pricing a Redesign
The August 2026 change opens a plan-registration route for certain authority-imposed interests; it does not make every private restriction removable.
NSW’s New Consultation Rules: Turn Early Engagement into a Better Development Strategy
NSW’s statewide Community Participation Plan starts 1 September 2026. Learn how developers can use clearer exhibition rules, early engagement and evidence-led design.
NSW’s New Development Referral System: What Could Actually Save Your Project Time
A practical developer guide to NSW’s new Development Coordination Authority, assumed concurrence and the checks that still matter before lodging.
Off-Market Development Sites Australia: How To Find Opportunities Before Everyone Else
Learn how off-market development sites work in Australia and what investors should check before approaching owners, agents or joint venture partners.
Off-Site Materials: Check Ownership and Security Before Paying Ahead
An invoice or warehouse photo does not establish that prepaid materials are available to your project if a supplier fails.
Options Over Property Australia: How Property Options Can Help Control A Deal Before Buying
Learn how options over property work in Australia, why investors use them, and what checks are needed before relying on an option agreement.
Party Wall Sound Insulation: The Check That Decides Your Attached Dwelling Layout
A separating wall between Class 1 dwellings needs an airborne rating of at least Rw + Ctr 50, and discontinuous construction in specific room pairings. Decide the wall before the floor plan hardens.
Planning Consultant Australia: What They Actually Do Before You Buy
Learn what planning consultants do in Australia, when to use one, and how they help investors understand a site before making an offer.
Progress Payments Construction Australia: How Staged Payments Work On A Build
How progress payments work on Australian construction projects and what investors should check before each stage release.
Property Deal Pack Australia: How To Present A Development Opportunity Properly
Learn how to prepare a property deal pack in Australia so a development opportunity can be reviewed properly by partners, investors or mentors.
Property Syndicate Structures Australia: How Investors Pool Capital For Bigger Deals
How Australian property syndicates work, letting investors pool capital to access larger deals than they could buy alone.
Quantity Surveyor Role Australia: Why Development Deals Need One Involved Early
What a quantity surveyor does on an Australian development project and why bringing one in early protects your numbers.
Queensland Building Certifier: Who Actually Approves Your Build
In Queensland the technical approval for your building work usually comes from a licensed private certifier, not the council. Knowing what the certifier does, what they do not do, and the order the approvals must arrive in turns a common cause of site delays into a controllable sequence.
Queensland Plan Sealing: The Step That Turns A Subdivision Into Titles
In Queensland an approved plan of subdivision is worthless until council seals it. Plan sealing is the compliance gate where infrastructure charges, rates, certificates and utilities all have to be resolved before a single title exists.
Queensland Rezoned Your Site? The Superseded Planning Scheme Clock Is Running
When a Queensland planning scheme is replaced and your site loses density, you have a short statutory window to ask for the old scheme to be applied. Miss it and the loss is permanent.
Refused In NSW? The Six-Month Clock And The Deemed Refusal Rule
A refusal is not the end of a project, but the appeal window, the deemed refusal date and the odds of negotiated settlement decide whether an appeal is worth running.
Regional Vs Metro Development Australia: Weighing Up Where To Invest
A practical comparison of regional and metro property development in Australia, and the trade-offs investors should weigh.
Renovation Vs Development Australia: How To Choose The Right Property Strategy
Compare renovation and development strategies in Australia, including risk, capital, approvals, timing and profit potential.
Retaining Walls And Drainage In Property Development Australia: Hidden Costs That Blow Budgets
Learn why retaining walls and drainage often change development budgets in Australia and how investors can spot the risk early.
Retention And Payment Claims: Protecting Your Money On The Build
Retention is the security held back from progress payments, and in NSW the trust account rules for retention money apply only above a $20 million contract threshold. Below it, your protection comes from the contract.
Rezoning Speculation Risk Australia: Why Betting On Future Zoning Is Risky
Why speculating on future rezoning is a high-risk property investment strategy in Australia, and how to assess it properly.
Section 32 Vendor Statement Australia: What Investors Should Read Before Making An Offer
A plain-English guide to reading a Section 32 vendor statement before you make an offer on an Australian investment property.
Shared Driveway Agreements Australia: What Investors Should Check Before Buying
What Australian property investors need to know about shared driveway agreements, easements and common access risks before buying.
Site Classification Under AS 2870: The Test That Decides Your Footing Budget
A reactive clay site and a stable sand site can carry very different footing costs. The classification is a documented step, and it belongs in your feasibility, not your build.
Site Costs Blowout Australia: Why Development Budgets Go Wrong Underground
Why site costs are the most common source of budget blowouts in Australian property development and how investors can manage the risk.
Site Levels Before You Sign: How Cut And Fill Decides A Subdivision
The levels on a site decide where each dwelling can sit, how water leaves the block and how much earth you move to make both work. Read them before you make an offer, not after.
Small Lot Housing Code Australia: What Investors Should Know Before Subdividing
An investor's guide to small lot housing codes in Australia and what they mean for subdivision and infill development projects.
Soil Testing And Contamination Checks Australia: Why Investors Should Test Before Buying
Learn why soil testing and contamination checks matter for Australian property investors before buying land or a development site.
South Australia's Three Consents: Why One Approval Is Never Enough
In South Australia an approval is not one decision. Buying or subdividing on the assumption that one consent covers everything is how deals stall at the titles office.
Split Contract Property Deals Australia: How To Structure Settlement Risk More Safely
Learn how split contract property deals work in Australia and why they can help structure settlement risk, timing and deal control more safely.
Steep Land: The Geotechnical Question That Decides A Hillside Site
On a sloping site in New South Wales, gradient is not a design preference — it is a due diligence trigger, and in some councils a specific control. Knowing where the landslide risk provisions sit, and what a geotechnical assessment has to answer, decides whether a hillside site is a project or an expensive lesson.
Stop Asking Specialists “Is This Site Good?”
Get more useful advice from planners, surveyors, engineers and designers with a decision-led specialist brief.
Stop Browsing Listings: Build a Development-Site Search Brief
Turn vague property browsing into a disciplined sourcing process with must-haves, rejection rules and evidence fields.
Stop Chasing Listings: Source the Vendor Problem You Can Responsibly Solve
Match a genuine vendor need with controlled terms instead of treating every off-market conversation as an opportunity.
Student Accommodation Investment Australia: A Niche Worth Understanding
What Australian investors should know about student accommodation as a property niche, including demand drivers and risks.
Tasmania's 14-Day Appeal Clock: When A Permit Is Not Yet Worth Anything
In Tasmania a permit can be granted and still not take effect for fourteen days. Miss the deadline, or misread the servicing conditions, and the delay lands on your construction program.
Termite Risk Management On A New Build: The Hidden Item In Your Site Works
Termite protection is a code requirement with a design life, a durable notice and a maintenance obligation. Price it, document it, and hand it over properly.
The block everyone used as a driveway
A block that looked like a side driveway became a second development opportunity. The purchase hinged on making both homes work independently.
The Charge On The Title: Victoria's GAIC And What It Does To Your Growth-Area Feasibility
GAIC is a one-off charge on growth-area land that can be triggered by the transfer, the subdivision or even the building permit, and it attaches to the title until paid. Price it before you make an offer.
The Commonwealth Question: When Subdivision Needs An EPBC Referral
The Environment Protection and Biodiversity Conservation Act 1999 applies to actions that have or are likely to have a significant impact on protected matters, and it sits alongside your state approval rather than replacing it. Test whether your subdivision is a controlled action before you lodge.
The Construction Certificate NSW: What Must Be Paid And Signed Before Work Starts
In NSW a development consent alone does not let you build. A construction certificate has to be issued first, and it will not be issued until the money conditions — contributions, the long service levy and any security — are dealt with.
The house that arrived in two pieces
Jason and Amy turned one property into two homes by moving a house in two pieces. How would you decide whether to move, build or sell the land?
The Noise Clause That Kills Yield: Rail And Busy Road Sites In NSW
If your site sits in or next to a rail corridor or on a busy road, the consent authority cannot grant consent unless the internal noise criteria are met. Test the criteria before you buy the block, because they can dictate the building, not just the glazing.
The NSW Planning Agreement You Sign Before You Can Lodge
In parts of NSW a development cannot be consented until a planning agreement is in place. Test the obligation, the timing and who pays the legal costs before you commit.
The Occupation Certificate: Why You Cannot Sell Or Lease Without It
In New South Wales a completed new dwelling cannot lawfully be occupied, sold or leased until an occupation certificate is issued. The certificate is not a formality: it is only issued once every precondition in the consent is actually satisfied, which is where projects lose weeks.
The owner wanted two homes and only one sale
One owner developed two homes, sold one and kept the other as a rental. Here’s how to test what each home needs to deliver.
The partner who kept the land
When a subdivision partner wanted to keep the vacant lot, the deal needed a way to settle the other partner’s share in cash.
The Pre-Lodgement Meeting: The Cheapest Hour In Your Development
A pre-lodgement meeting is a short, paid conversation with council planners before you lodge a development application. On a site with a constraint or a variation, it is usually far cheaper than discovering the problem after lodgement.
The Questions to Ask Before a Consultant Scope Leaves a Gap
Map deliverables, interfaces and exclusions before two specialists each assume the other owns a critical task.
The sale that put a house into the land budget
A fictional four-lot subdivision shows how to rebuild sale evidence when a site finder’s workbook mixes vacant land with house-and-land packages.
The Subdivision Certificate Is Where Your Contributions Fall Due
Section 7.11 and 7.12 contributions are usually payable before the subdivision certificate is released, not at settlement or on completion. Sequence the cash, or the certificate stalls.
The Substation Your Site Has To Give Up: Electricity Capacity Before You Offer
In NSW the distributor can require transformers, switchgear and a place to put them on your land, free of cost to it. On a small infill site that footprint can cost you a dwelling.
The Unsewered Block That Cannot Actually Be Subdivided
On land without reticulated sewer, every new lot needs its own effluent disposal area and buffer distances. Test the soil and the boundaries before you commit.
Town Planning Objections Australia: How Neighbour Objections Can Delay A Development
How neighbour objections work in the Australian town planning process and what investors can do to manage the risk of delay.
Traffic And Parking Overlay Risk Australia: A Site Check Investors Often Miss
Understand how traffic and parking overlays in Australian planning schemes can affect property investment and development potential.
Tweaking A Victorian Permit: Secondary Consent Or A Section 72 Amendment?
A small change to approved Victorian plans can be a quick secondary consent or a full permit amendment. Choosing the wrong route costs money, notice and time.
Two homes presold. The builder still needs paying.
Model a builder claim against a delayed draw and see how much temporary equity a two-home project needs before settlement.
Vendor Finance Property Deals Australia: How Investors Can Structure Deals With Less Bank Pressure
Learn how vendor finance property deals work in Australia, why sellers may agree to flexible terms, and what investors should check before using this strategy.
VicSmart Or Ordinary Permit? The Ten-Day Pathway And What It Costs You
VicSmart can decide an eligible Victorian permit in ten business days with no neighbour notice. It also switches off the merits argument. Test eligibility before you brief a designer.
Victoria Cultural Heritage: The CHMP That Blocks The Permit
In Victoria a planning permit cannot be issued for a high impact activity on culturally sensitive land until a Cultural Heritage Management Plan is approved. Test the map, the assessment tier and the consultation timeline.
Victoria Foundation Data: Reconcile the Site Report Before Accepting the Price
A low building quote is difficult to compare when the footing assumptions have not been tied to your actual block.
Victoria Owner-Builder Eligibility: Test the Delivery Strategy Before Budgeting Savings
Managing trades yourself is a regulated responsibility. Check whether the proposed project and your intentions fit the Victorian owner-builder route.
Victoria Planning Overlays: The Small-Development Feasibility Check Investors Miss
A Victorian site can have the right zone but still carry overlay controls that change design, timing, specialist reports and approval risk.
Victoria’s Mid-Rise Code Is Live: The Six-Storey Site Test Developers Should Run First
How private developers can test four-to-six-storey apartment sites under Victoria’s Mid-Rise Code without overestimating yield.
Victorian Renovations: Keep Cost-Plus Investigation Separate From the Main Build
Before accepting an open-ended renovation offer, establish whether cost-plus pricing is permitted and where investigation ends and the priced building scope begins.
Western Australia's Clearing Permit: The Bushland Test Before You Design
In Western Australia, clearing native vegetation is prohibited unless you hold a permit or an exemption applies. Test the vegetation, the land use zone and the offset exposure before you let a layout assume the bushland will simply be removed.
Wet Area Waterproofing On A New Build: The Scope Your Tiler Must Be Given
Shower walls waterproofed to at least 1800 mm, waterproof wall and floor junctions, and a floor-waste rule decide whether your bathroom leaks. Set that scope in writing before the screed goes down.
When the Feasibility Looks Good: Try to Break It
Learn a five-shock sensitivity test for revenue, build cost, interest, timing and yield before you trust a headline margin.
When The Work Crosses The Boundary: NSW Access Orders Explained
Scaffolding, crane loads, underpinning and drainage can all need temporary access over a neighbour's land. In NSW, the Access to Neighbouring Land Act 2000 provides a court process, not a right to help yourself.
Where The Dirt Goes: Classifying Excavated Soil Before You Price Your Basement
A basement or deep services trench produces hundreds of tonnes of soil, and how it is classified decides whether it leaves site cheaply or costs more than the concrete you are pouring. Test it before you price the dig.
Which NCC Edition Applies To Your Building Permit? The Adoption Date Trap
NCC 2025 was published nationally, but each state decides when it applies. Get the edition and transition wrong and your design, your costs and your program shift after the plans are drawn.
Who gets paid if council says no?
Use a fictional two-home project to compare payment milestones, specialist costs and stop points before accepting an approvals-only development engagement.
Whole-Of-Home Energy In NCC 2022: The Budget That Prices Your Appliances Before You Build
NCC 2022 added a second energy test alongside the star rating: a whole-of-home annual energy budget for fixed appliances. Here is how it changes your specification cost before you commit to a build.
Within 40 Metres Of The Water: The NSW Approval Your DA Does Not Include
In New South Wales, most work in or near a river, lake or estuary needs a controlled activity approval on waterfront land, and it usually rides with your development application as integrated development. Test the 40 metre line before you commit to a design.
Would a buyer pay for your new-build upgrade?
Compare the delivered cost of a new-build upgrade with matched settled sales before including a finish premium in your feasibility.
Your Consent Has A Clock: Physical Commencement In NSW
A NSW development consent generally lapses five years after it starts to operate, and survey pegs, soil testing and site clearing do not stop the clock. The consent has to be genuinely physically commenced.
Your Subdivision Can Trigger a Whole-Street Upgrade
A two-lot subdivision can carry conditions to build kerb, gutter, footpath and street lighting along the whole frontage. Price the road reserve before you sign.